Saint Mba550 final exam

Question # 00009210 Posted By: neil2103 Updated on: 02/26/2014 03:59 PM Due on: 02/28/2014
Subject General Questions Topic General General Questions Tutorials:
Question
Dot Image

Question 1.1.In a ________ integer model, all decision variables have integer solution values. (Points : 5)





Question 2.2.The $75 per credit hour course fee tacked on to all the MBA classes has generated a windfall of $56,250 in its first semester. "Now we just need to make sure we spend it all," the Assistant Dean cackled. She charged the Graduate Curriculum Committee with generating a shopping list before their next meeting. Four months later, the chairman of the committee distributed the following. As the professor for the quantitative modeling course, he tended to think in terms of decision variables, so he added the left-most column for ease of use.

Decision
Variable
Item Cost Note
AiPads for everybody $750/unitMust get a cover if these are purchased
BiPad covers with MBA logo$25/unitNot needed unless we buy iPads
CSpeaker series$15,000Can't afford both this and the iPads
DSubscriptions to the Wall
Street Journal
$10/unitDon't need if we have the electronic version
ESubscriptions to the electronic
version of the Wall Street
Journal
$5/unitWorthless without the iPads

Which constraint best describes the situation with decision variables A and B? (Points : 5)





Question 3.3.Types of integer programming models are ________. (Points : 5)





Question 4.4.________ is used to analyze changes in model parameters. (Points : 5)





Question 5.5.Cully Furniture buys two products for resale: big shelves (B)and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75,000 to invest in shelves this week, and the warehouse has 18,000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. Which of the following is not a feasible purchase combination? (Points : 5)





Question 6.6.Which of the list of items below is not a component of a linear programming problem? (Points : 5)





Question 7.7.The production manager for the Coory soft drink company is considering the production of two kinds of soft drinks: regular (R) and diet(D). Two of the limited resources are production time (8 hours = 480 minutes per day) and syrup (1 of the ingredients), limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. What is the time constraint? (Points : 5)





Question 8.8.In a ________ integer model, some solution values for decision variables are integers and others can be non-integer. (Points : 5)





Question 9.9.The $75 per credit hour course fee tacked on to all the MBA classes has generated a windfall of $56,250 in its first semester. "Now we just need to make sure we spend it all," the Assistant Dean cackled. She charged the Graduate Curriculum Committee with generating a shopping list before their next meeting. Four months later, the chairman of the committee distributed the following. As the professor for the quantitative modeling course, he tended to think in terms of decision variables, so he added the left-most column for ease of use.

Decision
Variable
Item Cost Note
AiPads for everybody $750/unitMust get a cover if these are purchased
BiPad covers with MBA logo$25/unitNot needed unless we buy iPads
CSpeaker series$15,000Can't afford both this and the iPads
DSubscriptions to the Wall
Street Journal
$10/unitDon't need if we have the electronic version
ESubscriptions to the electronic
version of the Wall Street
Journal
$5/unitWorthless without the iPads

Which of the following constraints best describes the relationship between the electronic Wall Street Journal subscription and the iPads? (Points : 5)





Question 10.10.Mallory Furniture buys two products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75,000 to invest in shelves this week, and the warehouse has 18,000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. If the Mallory Furniture company decides to purchase 150 big shelves and no medium shelves, which of the two resources will be left over? (Points : 5)





Question 11.11.The $75 per credit hour course fee tacked on to all the MBA classes has generated a windfall of $56,250 in its first semester. "Now we just need to make sure we spend it all," the Assistant Dean cackled. She charged the Graduate Curriculum Committee with generating a shopping list before their next meeting. Four months later, the chairman of the committee distributed the following. As the professor for the quantitative modeling course, he tended to think in terms of decision variables, so he added the left-most column for ease of use.

Decision
Variable
Item Cost Note
AiPads for everybody $750/unitMust get a cover if these are purchased
BiPad covers with MBA logo$25/unitNot needed unless we buy iPads
CSpeaker series$15,000Can't afford both this and the iPads
DSubscriptions to the Wall
Street Journal
$10/unitDon't need if we have the electronic version
ESubscriptions to the electronic
version of the Wall Street
Journal
$5/unitWorthless without the iPads

Which of the constraints best describes the relationship between the iPads for everyone and the speaker series? (Points : 5)





Question 12.12.Multiple optimum solutions can occur when the objective function is _______ a constraint line. (Points : 5)





Question 13.13.A linear programming model consists of: (Points : 5)





Question 14.14.If a maximization linear programming problem consists of all less-than-or-equal-to constraints with all positive coefficients and the objective function consists of all positive objective function coefficients, then rounding down the linear programming optimal solution values of the decision variables will ________ result in a feasible solution to the integer linear programming problem. (Points : 5)





Question 15.15.Elements of project planning include: (Points : 5)





Question 16.16.The activities that must be completed prior to the start of an activity in question are called the immediate ________ of the activity in question. (Points : 5)





Question 17.17.If t is the expected completion time for a given activity, then _____. (Points : 5)





Question 18.18.Which of the following could be a linear programming objective function? (Points : 5)





Question 19.19.A work breakdown structure breaks down a project into: (Points : 5)





Question 20.20.Decision variables: (Points : 5)



Dot Image
Tutorials for this Question
  1. Tutorial # 00008823 Posted By: neil2103 Posted on: 02/26/2014 04:44 PM
    Puchased By: 5
    Tutorial Preview
    The solution of Saint Mba550 final exam...
    Attachments
    saint_mba550_final.docx (194.63 KB)
    Recent Feedback
    Rated By Feedback Comments Rated On
    ja...gon Rating Best academic assistance 05/20/2015
    mi...300 Rating Tutors expertise in their field of interest 11/19/2014
    d...ymo Rating Highly educated and experienced experts 07/27/2014

Great! We have found the solution of this question!

Whatsapp Lisa